Page 119 of 119

Re: Aarons Drag CQ: 3-9 wetsand and buff the roof

Posted: Sat Mar 09, 2013 9:45 pm
by Audilard
That looks really good Aaron. I like the fleck in the paint!

Re: Aarons Drag CQ: 3-9 wetsand and buff the roof

Posted: Sat Mar 09, 2013 10:09 pm
by speeding-g60
yeah, the platinum pearl came out good. mixed it kinda strong, and it shows..... and its deep in there too, i think we did 5 coats of clear? one good heavy coat, then the pearl, then 3 more on top of it. he is going to buff it out again in a week or two. its sooooo silky smooth.

Re: Aarons Drag CQ: 3-16 AWIC piping work

Posted: Sat Mar 16, 2013 10:27 pm
by speeding-g60
and Justin, aka Nubworks, came down to get some of this AWIC piping knocked out. partway thru it we decided on something really different and REALLY COOL, so we stopped at the inlet stuff. Chris (Chris@Nubworks) is gonna make the part tomorrow, then we will work on it when he comes back down again. cant wait to see that part.

Image

Image

Image

the little circles of cardboard are to set the correct space for the coupler ferrules.

Image

and dont hate on my home Ghetto-fab radius work. this is the inlet to the AWIC. wait until you see what Chris builds for the outlet side, that is tomorrow. its gonna be badass.

Image

Image

Re: Aarons Drag CQ: 3-16 AWIC piping work

Posted: Sat Mar 16, 2013 11:28 pm
by Hank
The build up for Nub's work tomorrow is killing me :)

Re: Aarons Drag CQ: 3-17 coolant res

Posted: Sun Mar 17, 2013 8:49 pm
by speeding-g60
Chris@Nubworks made somethin cool for it. and he showed me pictures. but i will pick it up tomorrow on the way home from work.

i was working on the coolant res and overflow can. Derek came over to make a few tacks for me but ended up welding it out. thanks D! i had both pieces made, he welded the brackets to mount and attach to each other.

Image

Re: Aarons Drag CQ: 3-17 coolant res

Posted: Mon Mar 18, 2013 7:13 pm
by speeding-g60
and i stopped by to see Chris@Nubworks to pick up some goodies.

the plates for the coilover sleeves.... it was much easier to have him machine them than me to hole-saw them out like normal. and since he was bored at work over the weekend he put them on an EDM machine :) said it took about 50 minutes per, and i told him the rest i can cut by hand LOL.

and using Koni Sports. NOS on Flea-bay. $94 for the pair. adjustable rebound :)

Image

Image

Image

Image

Image



oh yeah.. and the new AWIC outlet flange.... whipped up something to smooth the flow coming out of this beastie. Nubworks and Chris@ Nubworks designed. GREAT JOB!

Image

Image

Image

Image

Image

Image

Re: Aarons Drag CQ: 3-18 custom machined parts :)

Posted: Mon Mar 18, 2013 9:39 pm
by 85oceanic
Dang Aaron, things are looking dang nice! BIG :thumbsup: :thumbsup: :thumbsup:

Re: Aarons Drag CQ: 3-18 custom machined parts :)

Posted: Tue Mar 19, 2013 6:35 am
by speeding-g60
[youtube]http://www.youtube.com/watch?v=T33zdVdd42c[/youtube]

Re: Aarons Drag CQ: 3-18 custom machined parts :)

Posted: Wed Mar 20, 2013 10:46 pm
by speeding-g60
and along with longer and turned in steering arms, it requires shorter tie rod/steering rod arms.

the mega bitch of this was to drill out the solid centers to make sure there was room for the heim joint threaded portion. and the handy dandy lug-nut weld-bungs is always fun.

Image

Image

Re: Aarons Drag CQ: 3-24 more welding done....

Posted: Sun Mar 24, 2013 5:44 pm
by speeding-g60
got more work done. finished the fitting of the AWIC and its piping. built a new catch can, with internal baffle and drain port back to the pan. and did the final welding of the coolant reservoir stuff. welded on the BOV flange.

now for Justin aka Nubworks to finish up the welding and it all goes back in for the final time.... we got to get to the freakin track!!!!

PRIVATE TRACK DAY IS JUNE 3RD!!!!!!! AAAAGH!!!!!

Re: Aarons Drag CQ: 3-24 more welding done....

Posted: Sun Mar 24, 2013 6:16 pm
by speeding-g60
yeah... forgot some pictures. everyone likes pictures.

Image

Image

Image

Image

AWIC

Image

Image

Image

Image

Image

Re: Aarons Drag CQ: 3-24 more welding done....

Posted: Mon Mar 25, 2013 10:51 am
by Hank
Box looks good. Must be nice not having to worry about weight up front!

Re: Aarons Drag CQ: 3-24 more welding done....

Posted: Tue Mar 26, 2013 10:50 pm
by speeding-g60
and picked up the AWIC and catch can. and on to install this stuff tonight.

also i mounted and plumbed the clutch release valve setup. will give it another try and see how it does.

Image

Image

Image

then i worked some on the coolant lines and stuff

Image

and NOW it is starting to look like something again..... boy i cant wait!!

Image

Re: Aarons Drag CQ: 3-24 more welding done....

Posted: Fri Mar 29, 2013 7:51 pm
by speeding-g60
dunno where i was with updates, so here goes.

also remade some new front coilovers. turned the steering arms inwards some for tire clearance, lengthened them, and shortened the steering rods.

had 03Boosted machine up some quick plates for the struts to support the sleeves and steering arms, and the strut spacer/locater as well.

Image

Image

finished up the logo.

Image

my MAIN DUDE out there always with me.... we rockin out and turning wrenches LOL

Image

Image

also finished all the new AN lines for stuff. red/blue is vapors. red/black is fuel. black/black is coolant.

Image

Image

Re: Aarons Drag CQ: 3-24 more welding done....

Posted: Fri Mar 29, 2013 7:53 pm
by speeding-g60
and been working on some more stuff.

got the coolant res and overflow done. got a new catch can made. got the fuel cell sorted out, welded up, and anodized. also put the launch control clutch valve setup back in.

i am on too many different forums to pay attention to them all, but when i get a response or question to one, i answer it and then update it. no answer, no update.

Image

Image

Image

Image

Image

Image

Image

Image

Image

Re: Aarons Drag CQ: 3-29 anodized and welded stuff. AN line

Posted: Fri Mar 29, 2013 10:32 pm
by quattro87
Getting to look pretty industrial what with all that Swagelock going on. :D Looking good like always.

Re: Aarons Drag CQ: 3-29 anodized and welded stuff. AN line

Posted: Sun Mar 31, 2013 8:46 pm
by DNel928
Just read all of this, and I must say this is a pretty awesome machine! Love NubWorks fab as well, always delighted to see his posts on FB ;)

Re: Aarons Drag CQ: 3-29 anodized and welded stuff. AN line

Posted: Mon Apr 01, 2013 10:23 am
by Hank
How much to anodize the tank?

Re: Aarons Drag CQ: 3-29 anodized and welded stuff. AN line

Posted: Mon Apr 01, 2013 10:36 am
by 85oceanic
Aaron, all I can say is....

:drool:

Re: Aarons Drag CQ: 3-29 anodized and welded stuff. AN line

Posted: Tue Apr 02, 2013 9:05 pm
by glibobbo21
NOMNOMNOM